135 Bishopsgate
Client: British Land | Duration: 32 Weeks | Value: £7,500,000

Cantillon have been appointed by British Land to undertake the full soft strip and structural alterations works package for 135 Bishopsgate. The building is situated directly adjacent to and above Liverpool Street Station and is being developed into prime retail and office space.

DOWNLOAD CASE STUDY

Audley Square
Client: Caudwell Properties | Duration: 120 Weeks | Value: £9,500,000.00

Cantillon were awarded the enabling and demolition package at this highly sensitive scheme in Mayfair. Essentially a residential district, with commercial and administrative businesses, embassies and clubs. The existing site buildings included a 3 upper / 3 lower storey NCP car park, No. 4 Audley Square and the Ascott Hotel.

DOWNLOAD CASE STUDY

Ilona Rose House – Charing Cross Road
Client: Soho Estates Value: £20,500,000.00

Client:  Soho Estates|Duration: 87 weeks| In preparation of the major construction project to follow, Cantillon are currently undertaking the demolition and clearance of the existing buildings and subsequent formation of the proposed basement at circa 17m below street level.  The demolition works refer to 11 buildings overall, including Goldbeaters House, Trefoil Building, 113-119 Charing Cross […]

READ MORE DOWNLOAD CASE STUDY

Sun Street Terrace
Client: Alloy Mtd | Duration: 55 Weeks | Value: £9,000,000

Cantillon undertook the structural stabilisation package of the existing Georgian brick buildings at 5-15 Sun Street Terraces on behalf of Alloy Mtd. The terraces had remained empty and for over 30 years and had fallen into a state of significant disrepair.

READ MORE DOWNLOAD CASE STUDY

Oxford Street
Client: Great Portland Estates | Duration: 46 Weeks | Value: £3,900,000

Cantillon, under a pre-demolition services agreement, played a significant role in assisting the client to develop the scheme and secure planning working. A number of technical challenges were addressed during the PDSA period, including the façade retention and jacking process.

READ MORE DOWNLOAD CASE STUDY

London School of Economics
Client: LSE | Duration: Ongoing | Value: £7,300,000

Cantillon were awarded the demolition contract to facilitate the centre buildings development at the London School of economics. Demolition of 30 floors has been undertaken concurrently across the East building, The Anchorage, Clare Market and St Clements East wing. Works were undertaken under a JCT design and Build contract.

READ MORE DOWNLOAD CASE STUDY

Queensbridge House
Client: 4C Hotels | Duration: 44 Weeks | Value: £6,300,000

Queensbridge House is located in the Mansion House area of the City of London. The project consists of five buildings which occupy locations to the north, south and directly over Upper Thames Street.

READ MORE DOWNLOAD CASE STUDY

Seymour Street
Client: Portman Estates | Duration: 45 Weeks | Value: £5,000,000

Cantillon were appointed as Principal Contractor to undertake the demolition and enabling works of the former Marylebone Police Station on behalf of the Portman Estate.

READ MORE DOWNLOAD CASE STUDY

Riverwalk House
Client: Ronson CP | Duration: 48 Weeks | Value: £3,800,000

Cantillon recently delivered the demolition, earthwork support and bulk excavation package at Riverwalk House for Ronson Capital partners and Sir Robert McAlpine. Situated in Pimlico, the project was bounded by Millbank, the River Thames and Vauxhall Bridge.

READ MORE DOWNLOAD CASE STUDY

Spire London / Hertsmere House
Client: Greenland | Duration: 67 Weeks | Value: £4.8M

The Spire London/Hertsmere House project is located in Canary Wharf, Docklands, comprising the demolition and clearance of a 5-story former office building down to ground floor level, installation of temporary works, demolition and clearance of the basement box, removal of foundations, pile probing, construction of piling platform and piling plant foundations, construction of capping beams, […]

READ MORE DOWNLOAD CASE STUDY