Latest News:
July 16, 2020
Cantillon delivered the demolition and piling package to the Existing Bankside substation in 2010. This paved the way for the 1st Phase of the Transforming Tate Modern project and the creation of the ‘Oil Tanks’ Space.
Stonebridge Estate, London
Back to Posts
Oxford Street, London